MISSION: To achieve the effective use of physical facilities through efficient operation, maintenance, renewal & expansion, to create a safe campus environment, and to improve transportation access.
ACTIVITIES: Facilities Management, Facilities Renewal, Environmental Health & Safety, Energy Management, Emergency Operations Center, Space Allocation, and Alternative Transportation.
Vacant
Associate Vice President of Facilities Planning & Operations
(510) 885-4144
Vareece Jordon
Executive Assistant
(510) 885-3513
Office Fax: (510) 885-2167
RFP STEM Education Building
Stadium Synthetic Turf Project
Hayward Campus Master Plan Final Environmental Impact Report
- Cover/Title/Contents
- 1. Introduction
- 2. Revisions to the Draft EIR
- 3. Comments on the Draft EIR and Responses to Comments
- 4. Mitigation Monitoring and Reporting Program
- 5. Report Preparation
Cal State East Bay Hayward Master Plan (Final)
- Cover/Contents/Figures+Tables
- 1. Introduction
- 2. Planning Context
- 3. The Vision For the Hayward Campus
- 4. Sustainable Campus Framework
- 5. Land Use and Site Development Framework
- 6. Open Space and Landscape Framework
- 7. Access, Circulation and Parking Framework
- 8. Infrastructure and Utilities Framework
- 9. Precinct Plans
- Appendix
Cal State East Bay Draft Environmental Impact Report
Copies of the Draft EIR and the Final EIR may be requested by contacting Jim Zavagno at 510-885-4149. The Draft EIR and all documents referenced in the Draft EIR, as well as the Final EIR, are available for review at the following address:
California State University, East Bay
Facilities Planning & Operations, Room Number ST 170
25800 Carlos Bee Boulevard
Hayward, CA 94542-3022
Contact: Jim Zavagno, University Planner
Copies of the Draft EIR are also available for review at the following locations during normal business hours.
Campus Main Library
25800 Carlos Bee Boulevard
Hayward, CA 94542-3022
Reference Desk
City of Hayward Main Library
835 C Street, Hayward, CA 94541
Reference Desk
Public Comment Period: Your comments on the contents and adequacy of the Draft EIR are invited. The period for accepting comments on the Draft EIR begins on Monday November 10, 2008 and ends at 5:00 p.m., Wednesday, December 24, 2008. Any comments should be submitted in writing to the following address:
California State University, East Bay
Facilities Planning & Operations
25800 Carlos Bee Boulevard
Hayward, CA 94542-3022
Attention: Jim Zavagno, University Planner
The University will conduct a public meeting to receive oral comments on the Draft EIR on December 9, 2008 from 7:00 pm to 9:30 pm on the California State University, East Bay Hayward Campus in the New University Union, Multi-purpose Room B.
Cal State East Bay
Hayward Campus Master Plan
Draft Environmental Impact Report
Volume I
- Cover and Table of Contents
- 1. Introduction
- 2. Executive Summary
- 3. Project Description
- 4. Environmental Impact Analysis
- 4-1. Aesthetics
- 4-2. Air Quality
- 4-3. Biological Resources
- 4-4. Cultural Resources
- 4-5. Geology and Soils
- 4-6. Hazards and Hazardous Materials
- 4-7. Hydrology and Water Quality
- 4-8. Land Use and Planning
- 4-9. Noise
- 4-10. Population and Housing
- 4-11. Public Services
- 4-12. Transportation and Traffic
- 4-13. Utilities and Service Systems
- 5. Alternatives
- 6. Other CEQA Considerations
- 7. List of Preparers/Organizations Consulted
Cal State East Bay
Hayward Campus Master Plan
Draft Environmental Impact Report
Volume II
- Cover and Table of Contents
- 1. Introduction
- 2. Pioneer Heights Phase IV Project
- 3. Harder Road Parking Structure
Appendices
Volume III
- 1. Notices of Preparation and Scoping Comments
- 4-2. Air Quality Modeling Output
- 4-2a. Construction Air Emissions
- 4-2b. Project Operational Mobile Source Emissions
- 4-2c. Project Operational Area Source Emissions
- 4-2e. CALINE4 CO Emissions Calculations With Hayward Extension
- 4-2f. CALINE4 CO Emissions Calculations Without Hayward Extension
- 4-2g. Greenhouse Gas Emissions Calculations
- 4-9. Noise Modeling Output
- 4-12. Traffic Technical Report
